Half Cable Cowl
Materials
• US 7 24" Circular Amazon
• 1 Beginning of the Round Stitch Marker
• 4 Removable stitch markers
• Cable Needle (or double pointed needle to be used as a cable needle)
• Tapestry Needle
Yarn
• 300 Yards (274 m) DK Weight Yarn (Weight #3)
• Shown in: Chelsea Luxe Rustic DK in the Peaches & Cream Colorway
Disclaimer: Some links provided are affiliate links and I receive a small commission when used. These commissions help to support the free content I offer!
Free Knitting Pattern
Finished Measurements & Gauge
Circumference: 32” (81 cm). Width: 10” (25 cm). Gauge: 10.5 stitches × 13 rows = 2” × 2”.
Materials
300 yards (274 m) DK (#3) yarn; US 7 (4.5 mm) 24” circular knitting needle; cable needle (or a double-pointed needle used as a cable needle); 1 beginning-of-round stitch marker; 4 removable stitch markers; tapestry needle. The sample uses Chelsea Luxe Rustic DK in the Peaches & Cream colorway.
Cast On & Beginning Ribbing
Cast on 168 stitches using the long-tail cast-on. Place the beginning-of-round marker and join in the round.
Ribbing round: Repeat (knit 4, purl 4) across the round. Continue until the cowl measures 1” (2.5 cm) from the cast-on edge.
Place Stitch Markers
Place removable stitch markers after the 24th, 30th, 134th, and 140th stitches. These are SM1, SM2, SM3, and SM4, respectively.
Chart A
Read the chart from the bottom up, working each round from right to left. Use the symbol key below for all cable crossings.
Step 1: Purl to SM1.
Step 2: Work Chart A between SM1 and SM2. Repeat the portion between SM2 and SM3 until you reach SM3. Finish the chart with the SM3-to-SM4 section.
Step 3: Purl the remainder of the round.
Work all 4 rounds of Chart A in this way.
Shift Markers After Chart A
Move SM1 to the left 4 stitches, to after the 28th stitch.
Move SM2 to the left 8 stitches, to after the 38th stitch.
Move SM3 to the right 8 stitches, to after the 126th stitch.
Move SM4 to the right 4 stitches, to after the 136th stitch.
Chart B
Step 1: Purl to SM1.
Step 2: Work Chart B between SM1 and SM2. Repeat the portion between SM2 and SM3 until you reach SM3. Finish the chart with the SM3-to-SM4 section.
Step 3: Purl the remainder of the round. Continue these steps for each round of the chart.
Shift Markers After Each Chart B Repeat
Move SM1 and SM2 to the left 8 stitches each. Move SM3 and SM4 to the right 8 stitches each.
Work Chart B a total of 4 times, shifting the markers after each complete chart repeat. Then work Rounds 1–5 of Chart B one additional time. Remove the 4 removable stitch markers.
Cable Symbol Key
End Ribbing & Finishing
Ribbing round: Repeat (knit 4, purl 4) across the round. Continue for 1” (2.5 cm).
Bind off all stitches. Jeny’s Stretchy Bind Off is shown in the video tutorial. Weave in all ends, block, and enjoy!