Cable Knit Mittens

Learn step-by-step to read a knitting cable chart by creating a beautiful pair of fleece-lined mittens!

In this knitting tutorial, I take you through each one of the steps you need to knit a set of cable knit mittens! The main focus of this video is learning how to read a cable chart.

Skill Level: Intermediate

Gauge
• Ribbing on US 6: 6 sts x 7.5 rounds = 1” x 1”
• Cable Pattern on US 8: Cable Chart Repeat (20 stitches x 20 rounds) = 3.4” x 3”

Size: One Size
• Across Palm Unstretched: 3.75” (9.5 cm)
• Total Length: 9.75” (25 cm)

Materials
• Cable Needle Amazon
• Lykke US 6 Amazon
• Lykke US 8 Amazon
• Tapestry Needle Amazon
• Waste yarn to hold the thumb stitches
• 160 yds (146 meters) Brooklyn Tweed Tones (Worsted/Medium/#4 Weight Yarn) Loop Yarn
• Optional: sewing needle, thread, and fabric to add a lining!


Disclaimer: Some links provided are affiliate links and I receive a small commission when used. These commissions help to support the free content I offer!

 
 

Cable Charts

Left Mitten Cable Chart
Left Mitten Cable Chart
Right Mitten Cable Chart
Right Mitten Cable Chart

Written Pattern

Use the size or color option that matches your project. The original PDF download remains available above.

Pattern directions - page 1

Cable Knit Mittens

YouTube Tutorial: https://youtu.be/-ENSFHDqVlY

Size: One Size

• Across Palm Unstretched: 3.75” (9.5 cm)

• Total Length: 9.75” (25 cm)

Materials (Video Time 2:09)

• 160 yds (146 m) worsted (#4) weight yarn

o Shown in Brooklyn Tweed Tones - Stonewash

• US 8 (5 mm) Circular Knitting Needle 32” (or longer)

• US 6 (4 mm) Circular Knitting Needle 32” (or longer)

o Note if you are not adding a lining, I would recommend using a US 7 and US 5

instead of the sizes suggested above

• Tapestry Needle

• Cable Needle

• Waste yarn to hold thumb stitches

• Scissors

• Ruler

• Optional: sewing needle thread, and fabric for lining

Gauge

• Ribbing on US 6: 6 sts x 7.5 rounds = 1” x 1”

• Cable Pattern on US 8: Cable Chart Repeat (20 stitches x 20 rounds) = 3.4” x 3”

KNITTING HOUSE SQUARE 1

KnittingHouseSquare.com

 

 

 

 

Pattern directions - page 2

Left Mitten (Shown in Video)

Cast-On (Video Time 04:23)

Use the smaller knitting needle size to cast on 40 stitches using your preferred stretchy

cast-on method (some recommendations include: backward loop, long-tail, or German

twisted). Join in the round for magic loop.

Ribbing Repeat Round

Ribbing Repeat Round: Knit 2, Purl 2 repeat between *s for the full round

Work the Ribbing Repeat Round until the work measures 2” (5 cm).

Increase the Knitting Needle Size (Video Time 12:29)

Work one final Ribbing Repeat Round, increasing to the larger knitting needle size.

(Note: this is the first round labeled “Increase Knitting Needle Size” on the cable chart)

Left Mitten Cable Chart (Video Times 12:41 and 16:18)

The cable chart is worked on the first half of the stitches (first knitting needle in a magic

loop round), the second half of the stitches are all purled (second knitting needle in a

magic loop round).

Work rounds 1 – 20 of the left mitten cable chart. After completing the second MP* in

Round 5, I would recommend placing a stitch marker to make it easier to keep track of

the thumb stitches.

• Thumb Increases Video Time 24:13

• Placing the Thumb Stitches on Waste Yarn Video Time 29:34

Work rounds 1 – 20 one additional time. For this repeat of the cable chart, work only

the stitches within the bold vertical lines (no thumb increases). The stitches labeled as

MP within these bold lines (example Round 5 stitch 2) should be worked as a purl stitch,

NOT a MP.

Work the decrease rounds (Video Time 33:18) – labeled as D#. The chart shows only the

decreases on the cable side of the mitten. The same number of stitches must also be

decreased from the non-cable side of the mitten. Below are the instructions for the

decreases on the non-cable side of the mitten.

*: P2T, purl until 2 stitches remain, P2T

**: P2T, P2T, purl until 2 stitches remain, P2T, P2T

Break the yarn leaving an 18” (46 cm) tail. Cast-off the remaining 12 stitches (6 stitches on each

knitting needle) using the Purl Side Kitchener Stitch.

KNITTING HOUSE SQUARE 2

KnittingHouseSquare.com

 

 

 

 

Pattern directions - page 3

Right Mitten

Cast-On

Use the smaller knitting needle size to cast on 40 stitches using your preferred stretchy

cast-on method (some recommendations include: backward loop, long-tail, or German

twisted). Join in the round for magic loop.

Ribbing Repeat Round

Ribbing Repeat Round: Purl 2, Knit 2 repeat between *s for the full round

Work the Ribbing Repeat Round until the work measures 2” (5 cm).

Increase the Knitting Needle Size (Video Time 12:29)

Work one final Ribbing Repeat Round, increasing to the larger knitting needle size.

(Note: this is the first round labeled “Increase Knitting Needle Size” on the cable chart)

Right Mitten Cable Chart

The cable chart is worked on the first half of the stitches (first knitting needle in a magic

loop round), the second half of the stitches are all purled (second knitting needle in a

magic loop round).

Work rounds 1 – 20 of the right mitten cable chart. Before completing the first MP* in

Round 5, I would recommend placing a stitch marker to make it easier to keep track of

the thumb stitches.

Work rounds 1 – 20 one additional time. For this repeat of the cable chart, work only

the stitches within the bold vertical lines (no thumb increases). The stitches labeled as

MP within these bold lines (example Round 5 stitch 19) should be worked as a purl

stitch, NOT a MP.

Work the decrease rounds – labeled as D#. The chart shows only the decreases on the

cable side of the mitten. The same number of stitches must also be decreased from the

non-cable side of the mitten. Below are the instructions for the decreases on the non-

cable side of the mitten.

*: P2T, purl until 2 stitches remain, P2T

**: P2T, P2T, purl until 2 stitches remain, P2T, P2T

Break the yarn leaving an 18” (46 cm) tail. Cast-off the remaining 12 stitches (6 stitches on each

knitting needle) using the Purl Side Kitchener Stitch.

KNITTING HOUSE SQUARE 3

KnittingHouseSquare.com

 

 

 

 

Pattern directions - page 4

Purl Side Kitchener Stitch (Video Time 41:56)

Set Up 1: Thread the tapestry needle knitwise through the first stitch on the front

needle, leave the stitch on the needle

Set Up 2: Thread the tapestry needle purlwise through the first stitch on the back

Repeat Step 1: Thread the tapestry needle purlwise through the first stitch on the front

needle, slide the stitch off of the needle

Repeat Step 2: Thread the tapestry needle knitwise through the new first stitch on the

front needle, keep the stitch on the needle

Repeat Step 3: Thread the tapestry needle knitwise through the first stitch on the back

Repeat Step 4: Thread the tapestry needle purlwise through the new first stitch on the

back needle, leave the stitch on the needle.

Continue working Repeat Step 1 through 4 until all stitches are cast-off.

Thumb – Both LEFT & RIGHT Mitten (Video Time 45:08)

Place the mitten on a table with the thumb increases towards the left. Use one of the

larger knitting needle points to pick up the first 6 stitches going from right to left

(starting where the thumb meets the mitten). Once the first 6 stitches are picked up,

pull on the knitting needle so the stitches end up on the cord. Turn the work over and

use the same knitting needle to pick up the second half of the stitches going from right

to left (going towards where the thumb meets the mitten). Slide your other knitting

needle onto the first half of the stitches and turn your work to begin magic loop. When

you begin working the thumb you will be beginning each round where the thumb meets

the mitten.

Set-Up Round 1: Purl 6, turn work, Purl 6, pick up and purl one stitch from the inner

corner, turn work

Set-Up Round 2: Pick up and purl one stitch from the inner corner, Purl 6, turn work,

Purl 7 (14 stitches total – 7 on each knitting needle)

Purl Repeat Round: Purl all stitches

Continue working the Purl Repeat Round until the thumb measures 2” (5 cm)

Thumb Decrease Round 1: P2T, Purl 1 repeat until 2 stitches remain, Purl 2

Thumb Decrease Round 2: Purl all stitches

Thumb Decrease Round 3: P2T across the round (5 stitches remain)

Cut your yarn leaving an 8” (20 cm) tail and use the tapestry needle to thread the tail

through the remaining stitches. Weave in all the ends.

Optional: After blocking your mitten – add a lining! For more details see Video Time 49:17

KNITTING HOUSE SQUARE 4

KnittingHouseSquare.com

 

 

 

 

Pattern directions - page 5

Left Mitten

** SK2P SK2P D10

* D9

* D8

* D7

* D6

D5

Note: there are 2 decreaserows labeled "D5" this was

a mistake. I decided to leave them labeled this way

* D5 since I used this chart in the video and I referred to

D4 specific decrease rows by name, I wanted them to still

match up.

D3

They are two separate decrease rounds. There are 11

D2 decrease rows total (D1 through D10 with two D5s)

D1

17 Place the first 12 stitches on waste yarn, cast on 2 stitches

MP* MP* 15

MP* MP* 13

MP* MP* 11

MP* MP* 9

MP* MP* 5

1 ←

↑

← Increase Knitting Needle Size

20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

 

 

 

 

Pattern directions - page 6

Right Mitten

** SK2P SK2P D11

* D10

* D9

* D8

* D7

D6

* D5

D4

D3

D2

D1

Place the 12 thumb stitches on waste yarn, cast on 2 stitches 17

MP* MP* 15

MP* MP* 13

MP* MP* 11

MP* MP* 9

MP* MP* 5

1 ←

↑

← Increase

Knitting

20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1

Needle Size

 

 

 

 

Pattern directions - page 7

Legend

Knit

Purl

Slip 2 stitches from the left knitting needle onto a cable needle and hold it in the front of work, purl the next stitch on the left

knitting needle, knit the two stitches being held on the cable needle

Slip 1 stitch from the left knitting needle onto a cable needle and hold it in the back of the work, knit the next two stitches from

the left knitting needle, purl the stitch begin held on the cable needle

Slip 2 stitches from the left knitting needle onto a cable needle and hold them in the back of the work, knit the next two

stitches from the left knitting needle, knit the two stitches being held on the cable needle

Slip 2 stitches from the left knitting needle onto a cable needle and hold them in the front of the work, knit the next two

P2T (Purl 2 together): Insert the right knitting needle through 2 stitches on the left knitting needle as if to purl, purl the two stitches

together

K2T (Knit 2 Together – right-leaning decrease): Insert the right knitting needle through 2 stitches on the left needle as if to knit, knit the two stitches

SSK (Slip, Slip, Knit – left-leaning decrease): Slip one stitch as if to knit from the left to right needle, slip another stitch as if to knit from the left to

right needle, pass the two stitches back over to the left needle, knit the two stitches together through the back loop

SK2P SK2P: Slip one stitch as if to knit from the left to right knitting needle, K2T, pass the previously slipped stitch up-over-and off of the

right knitting needle (2 stitches decreased)

*

* On the second half of the stitches, work a P2T, purl until 2 stitches remain, P2T

** On the second half of the stitches, work a P2T, P2T, purl until 4 stitches remain, P2T, P2T

MP* Make 1 Purlwise (MP): Use the left knitting needle to pick up the bar in-between the stitch that was just worked and the stitch that is

about to be worked from back to front, purl into the front of this bar (1 stitch increased)

Note: the MP are worked only during the thumb increases. For the second repeat of the cable chart, work only the stitches within the

bold vertical lines, the stitches labeled as MP within these bold lines (example Round 5 stitch 2) should be worked as a purl stitch, NOT

a MP

Cable Charts

Left Mitten Cable Chart

Right Mitten Cable Chart

Previous
Previous

Quick & Easy Fingerless Gloves - Knit FLAT!

Next
Next

Braided Cable Mittens