2x2 Tubular Cast On in the Round
Waste Yarn Method
This cast on method can be used when you are casting on ribbing that will be worked in the round, with Knit 2, Purl 2 ribbing.
The method I show uses waste yarn, where a multiple of the desired number of stitches is cast on using the waste yarn, and then the waste yarn is cut out after the work measures approximately 1".
Knitting Needles I am using Amazon
Disclaimer: Some links provided are affiliate links and I receive a small commission when used. These commissions help to support the free content I offer!
Written Pattern
The original downloadable pattern remains available above. Follow the size, yarn, and needle options that match your project.
Pattern directions - page 1
2 x 2 Flat Knitting Tubular Cast-On – Number of Stitches Divisible by 4
YouTube Tutorial: https://youtu.be/qK1qKWWEvL0
𝑋 = Total number of stitches for 2x2 Ribbing (must be divisible by 4)
!
Waste yarn cast-on = +1
"
*Note: The cast on is worked flat through Row 3. Beginning with Round 4, the cast on is switched
from being worked flat to being worked in the round.
Row 1: With waste yarn cast on the number of stitches using the formula above. Cut the waste yarn
leaving a 6” tail. Turn work.
Example: In the video I wanted to have a total of 32 stitches in 2x2 ribbing. To achieve this, I
#"
cast on +1 = 17 stitches using my waste yarn.
"
Row 2: Using your main fabric yarn, purl into each of the waste yarn stitches. Turn work.
Row 3: *Knit 1, pick up the bar between the last stitch worked and the next stitch to be worked
with your left needle from front to back, purl into this stitch* Repeat between the * until 2 stitches
remain. Knit 1 stitch. Pick up the bar between the last worked stitch and the final stitch on left
needle with the left needle from front to back. Purl the picked up stitch and the final stitch on the
left needle together. You should now have the number of stitches that you would like to work in
2x2 ribbing on your needle (𝑋). Turn work.
Re-arrange the stitches: *Slip 1 stitch to the right needle. Slip 1 stitch from the left needle to a
cable needle and hold in the back. Slip 1 stitch from the left to right needle. Slip the stitch from the
cable needle onto the right needle. Slip 1 stitch from the left to right needle* Repeat across the
row. Once you have finished rearranging the row, slip all the stitches back onto the left needle.
Prepare your work to join in the round. Round 4 and beyond are all worked in the round.
Round 4: Knit 2, bring the yarn to the front, slip 2 purlwise, return the yarn to the back Repeat
across the round
Round 5:
First four stitches: Knit 1, bring the yarn to the back, slip 1 purlwise, bring the yarn to the
front, purl 2.
Repeat: Bring the yarn to the back, slip 2 purlwise, bring the yarn to the front, purl 2
repeat across the round
You have now completed the tubular cast on steps, and you can begin regular Knit 2, Purl 2 ribbing
in the round. I would recommend cutting out your waste yarn once your piece measures approx. 1”